Restoration and Renovation Project: The Hayworth Tanglewood

52 Units. 4 Water Incidents. 4 Weeks to Completion.

Property Type: Multifamily/REIT

Location: Houston, TX (Tanglewood Area)

Length: 4 weeks

Trades: Flooring, painting, drywall repair & replacement, baseboards & trim, carpet installation, cabinetry, minor electrical, minor plumbing, and move coordination

The Hayworth: Rapid Response & High-Impact Restoration

A Multi-Faceted Water Damage Crisis

In 2024, The Hayworth, a Class A multifamily property located in the prestigious Tanglewood neighborhood in Houston, TX, faced a series of water damage crises that affected 52 units, both vacant and occupied. The challenges were significant:

  • Hurricane Beryl – Water intrusion from severe weather

  • Two major sprinkler failures – Causing massive flooding

  • Tenant-related water incident – Spreading damage to multiple floors

With separate insurance policies for each event and high resident expectations, the property management team needed a trusted, solutions-oriented partner to not only stabilize the situation immediately but also deliver a cost-effective, high-quality restoration solution.

Our Response: Immediate Action, Expert Coordination

Framework provided same-day response to each incident, leading the initial:

  • Site assessment & moisture mapping to document damage

  • Collaboration with adjusters to streamline claims for separate policies

  • Provided multiple options for emergency stabilization solutions to prevent further damage

From the moment we were engaged, we took ownership of the solution – not just the repairs. Our team worked closely with The Hayworth’s REIT corporate office, ensuring that the scope of work fit within claim budgets while upholding the high expectations of a Class A luxury property.

Value-Driven Strategy: Reducing Costs While Increasing Quality

Understanding the long-term impact of repeated water incidents, Framework spearheaded an effort to upgrade the property’s flooring – switching from traditional hardwood to luxury vinyl tile (LVT).

This strategic decision:

  • Reduced future maintenance costs

  • Safeguarded against water-related flooring damage

  • Improved long-term durability & resident experience

Beyond flooring, we applied value-engineering principles to source materials and labor at below-market rates, all while ensuring top-tier quality.

Execution: Half the Time, Maximum Efficiency

The project was initially scheduled to take 8 weeks, but Framework delivered it in just 4 weeks—without cutting corners.

Key execution highlights:

  • 52-unit restoration completed 50% faster than projected

  • Coordinated furniture relocation & storage in occupied units to minimize disruption

  • Met & exceeded Class A property standards with high-quality finishes